Photo Report: Major repair of Ilichevsk — Yerevan main gas transmission line
At present CJSC Gazprom Armenia is implementing major repair works of Ilichevsk-Yerevan main gas transmission pipeline with diameter of 700mm. In particular, the pipeline insulation coating is being repaired (with replacement of rejected pipes). The total length of the main gas transmission pipeline sections to be repaired makes about 41km.
Enlarged photo (JPG, 2 MB)