Photo report: Valve replacement works on Spitak-Aparan gas pipeline in the Lori region of Armenia
The Gasification and Gas Supply Branches (GGB) of CJSC Gazprom Armenia carry out comprehensive works of major and current repair of the gas distribution system infrastructure throughout the territory of Armenia to ensure the proper operation of Gazprom Armenia facilities for reliable, uninterrupted and safe gas supply to consumers within the framework of the activities of the autumn-winter program of 2023–2024.
In accordance with the approved schedule of the works, the construction and installation team of the Lori GGB replaced the gate valves installed on the Spitak-Aparan gas pipeline with a diameter of 300 mm.
Enlarged photo (JPG, 604 KB)