Photo report: Major repair of the Ghazakh-Yerevan (line II) main gas transmission pipeline
Major repair works of the Ghazakh-Yerevan main gas transmission pipeline (line II, DN700mm) are in progress within the framework of production programs of Gazprom Armenia for 2022. Currently, the block valve station №145 is being repaired with replacement of valves.
Enlarged photo (JPG, 710 KB)